505th Engineer Light Ponton Company a 140' DS Dual Carriage Bridge over the Ruhr (Hofen)
238th Engr. C. Bn. "A"
A 140' DS Dual Carriage Bridge was pre-loaded to be built by "A" Company over the Roer. It was preloaded since it was expected to be difficult to back trailers down the approach to the site