History
505th Engineer Light Ponton Company a 70' DS Bridge was immediately delivered
329th Engr. C. Bn.
A 70' DS Bridge was immediately delivered and put up by the 329th when a bridge was found to be blown over a small stream.
Another 50' DS Bridge was delivered and constructed in Birkesdorf just east of the Roer River.
Location?
Listing Details
Date
Status coordinate
No status yet
Read more about this record (link)
www.505th.net(120 visits)
Source of the information (link)
www.505th.net(0 visits)
E-mail publisher
Hits -
727
User
Fred Vogels
Read all about me on https://www.fredvogels.com
Map
Join me also in music and film
Join me at Spotify, Vimeo and my website with the music of Back to Normandy and so much more
Join me at Spotify, Vimeo and my website with the music of Back to Normandy and so much more
disclaimer
Back to Normandy™ building the story of d-day.
Disclaimer: This site is purely for hobby-research purposes only. All images, stories and logos are copyrighted to their respective owners.
If any content is not allowed to be published here, please contact the webmaster and the content will be removed. KVK: 78264294, Goudplevierstraat 34 8043JH Zwolle, NETHERLANDS