505th Engineer Light Ponton Company replace a bridge which had collapsed the day before
299th Eng. C. Bn.
The bridge equipment of the 1st Platoon was used to construct a bridge by the 299th Eng. C. Bn. across the Erft River to replace a bridge which had collapsed the day before when two medium tanks got on it at the same time. Location?
Listing Details
User
Fred Vogels
Please look at my personal website https://www.fredvogels.com
Map