History
505th Engineer Light Ponton Company a great need for Bailey Equip
Attached to the 501st Eng. L. Pon. , 1111 Eng, III Corp ( 1st & 2nd Bridge Platoons)
After the breakthrough to the Rhine River on the VII Corps Front there was such a great need for Bailey Equip. the 2 Bridge Platoons carrying 260 ' DD Bridge were temporarily attached to the 501st Engr. L. Pon., the 2nd Bridge Platoon until 22 March.
Listing Details
Date
Status coordinate
No status yet
Read more about this record (link)
www.505th.net(123 visits)
Source of the information (link)
www.505th.net(0 visits)
E-mail publisher
Hits -
701
User
Fred Vogels
Read all about me on https://www.fredvogels.com
Map
Join me also in music and film
Join me at Spotify, Vimeo and my website with the music of Back to Normandy and so much more
Join me at Spotify, Vimeo and my website with the music of Back to Normandy and so much more
disclaimer
Back to Normandy™ building the story of d-day.
Disclaimer: This site is purely for hobby-research purposes only. All images, stories and logos are copyrighted to their respective owners.
If any content is not allowed to be published here, please contact the webmaster and the content will be removed. KVK: 78264294, Goudplevierstraat 34 8043JH Zwolle, NETHERLANDS